Frameworks & lots

Frameworks Lots Start date End date
Lot 7 Drinks (Non-Alcoholic) Catering
01/06/2021 31/05/2026
Lot 11 Technology/equipment (to support/enhance the service/safety of food and drink served within the catering operation) Catering
01/06/2021 31/05/2026